Timeline

  • Set up Engineering Environment

     December 11, 2017 (74th day)

    After executing Set up Engineering Environment:
    Welcome to the official GitHub Organization Profile of Eventsprint with all the important repositories that one can contribute to Eventsprint. Shhh, we have some secret repositories in Private Mode too. Don't be haunted, we have some quality things for everyone anytime there, hop in now!

  • Introduction to Alpha Stage with Gautham

     December 11, 2017 (74th day)

    After executing Introduction to Alpha Stage with Gautham:
    We had an awesome session with Gautham and we got to know what exactly what we need to focus upon for Alpha Launch and also, we were able to know our current position. It was indeed a brainstorming session for us since it helped us to learn what we shouldn't stick with for now. We thank the SV.CO team for scheduling this session!

  • Develop Brand Basics for Alpha Launch

     December 11, 2017 (74th day)

    After executing Develop Brand Basics for Alpha Launch:
    Here you go! Get to know our design standards and the way how we portray our brand! The Color Swatches, the mood board and the brand words!

  • Decide on Alpha Technology Stack

     December 11, 2017 (74th day)

    After executing Decide on Alpha Technology Stack:
    We decided the Technology Stack for the Product Engineering. Do have a look for better understanding!

  • After executing Build a Product Narrative for the Alpha Prototype:
    We've worked with the Product Narrative and have assembled the required flow of modules and the backups. The attached document shows the detailed description of the working of each module.

  • Give an Overall Score for our Program

     December 8, 2017 (71st day)

    After executing Give an Overall Score for our Program:
    We have submitted our heartful feedback to the SV.CO team and how they helped us to achieve this position till now. Also we have sent them few suggestions to follow up. So far, so good!

  • Grade our Sessions

     December 8, 2017 (71st day)

    After executing Grade our Sessions:
    We have submitted our heartful feedback to the SV.CO team of the founders' teaching lessons! Thanks for the good role friends!

  • Design the first Alpha Logo

     December 8, 2017 (71st day)

    After executing Design the first Alpha Logo:
    All the design inspiration that revolves around those grey cells at the top led to this creativity. Here goes the logo that many liked just before we started to engineer our product.

  • After executing Decide Features for Alpha and Long-Term Rollout:
    The wishlist πŸ˜‹ features for our product at launch πŸš€ and a list of concrete achievable features for our Alpha Launch were analyzed successfully. The complete teardown of the feature set we planned to build πŸ— can be found in the timeline attachment. We have also distinguished the priority engineering πŸ‘¨β€πŸ”¬ that are in plans to incorporate into the product and the most common features. The high priority ones β€Ό are basically the ones which make the product stand out from our competitors! 🀩

  • Rope in a Senior Founder

     December 8, 2017 (71st day)

    After executing Rope in a Senior Founder:
    We've picked Bodhish from Ayushma to help us in senior mentoring. We made this move because we've already in contact with him from our Ideation stage and are looking forward for an extended relationship with their team!

  • Update Startup Profile

     December 8, 2017 (71st day)

    After executing Update Startup Profile:
    All the details and those cookie bites in the startup profile, getting their places in the right shape! The Startup Profile of Eventsprint is complete and now portrays the information one may need while reviewing the timeline of Eventsprint.

  • Grade our Faculty

     December 8, 2017 (71st day)

    After executing Grade our Faculty:
    We have submitted our heartful feedback to the SV.CO team and how they helped us to achieve this position till now. Also we have sent them few suggestions to follow up. So far, so good!

  • After executing Decide Features for Alpha and Long-Term Rollout:
    The wishlist πŸ˜‹ features for our product at launch πŸš€ and a list of concrete achievable features for our Alpha Launch were analyzed successfully. The complete teardown of the feature set we planned to build πŸ— can be found in the timeline attachment. We have also distinguished the priority engineering πŸ‘¨β€πŸ”¬ that are in plans to incorporate into the product and the most common features. The high priority onesβ€Όare basically the ones which make the product stand out from our competitors! 🀩

  • Report Engineering Progress & Roadblocks

     December 6, 2017 (69th day)

    After executing Report Engineering Progress & Roadblocks:
    Before starting to get the hands dirty, we sat to frame our future work in Engineering and set the expectations. The core modules that are to be developed are situated in the document with this timeline entry. To understand more about the Alpha Prototyping of the team, going through the documentation is much appreciated.

  • Trial Engineering Moving Parts

     December 6, 2017 (69th day)

    After executing Trial Engineering Moving Parts:
    The flaws that we encounter today are to correct it and make the product more polished. No little thing must be taken in a lighter sense and we're on the way to fix everything in N number of iterations. One such is this expedition of Trial Engineering. Look the document to know more.

  • Reverse Engineer a Competitor

     December 6, 2017 (69th day)

    After executing Reverse Engineer a Competitor:
    A day well spent in Reverse Engineering the product 'Eventbrite'. Eventbrite is an Event Management and a Productivity Measurement Cross-Platform Product aimed at bringing the world together by live experiences. It's great to go through the 10 year journey of Eventbrite to learn more about our competitor as well. Refer the Slides in the timeline event for insights about Eventbrite.

  • Identify Customer Segment for Alpha Prototype

     November 25, 2017 (58th day)

    After executing Identify Customer Segment for Alpha Prototype:
    We have 2 sets of segments to target our Alpha Release - The Community Managers & the Local Event Organizers. The more descriptive reasons and the plans are situated in the document attached with this timeline event.

  •  Improved Later

    Reverse Engineer a Competitor

     November 25, 2017 (58th day)

    After executing Reverse Engineer a Competitor:
    A day well spent by Reverse Engineering the product 'Eventbrite'. Eventbrite is a Event Management and a Productivity Measurement Cross-Platform Product aimed at bringing the world together by live experiences. It's great to go through the 10 year journey of Eventbrite to learn more about our competitor as well. Refer the Slides in the timeline event for insights about Eventbrite.

  • Improve Product Deck

     November 23, 2017 (56th day)

    After executing Improve Product Deck:
    We've upgraded and evolved the Product Summary to the Product Deck making it presentable. Have a look on it to get it's pointers!

  • Launch Coming Soon & Get Early Leads

     November 22, 2017 (55th day)

    After executing Launch Coming Soon & Get Early Leads:
    We have come up with an awesome site inspired by material UI and have a concept behind the coming soon page as well. Unlike the traditional sites, the design gives more interaction with the site visitors by prompting them to get notified of the product on its launch! Also, we have installed Drift, a superpower tool to track online leads and convert them into lifetime customers!